Designing and Constructing the Footbridge
Designing and Constructing the Footbridge
The centre section was lifted into position using the Gottwald crane on a revised boom length to achieve clearances over the front mast hairpin and cables. |
Designing and Constructing the Footbridge Newport Unlimited Footbridge Timelapse Footbridge Construction 2006